HVAC SYSTEMS

- Area calculation and load calculations
- Design of Indoor and Outdoor Equipment location.
- Design of Plant room and Equipment requirement details
- Design of ducting / piping and connection details layout
- Design of drain piping details layout
- Preparation of detail BOQ with specifications
- Preparation of electrical load details
- Preparation of contract Agreement
- Verification of shop drawings
- Preparation of detailed Cost Estimates
- Preparation of notice Inviting Tender